2009 Sector Test - BT aspects
The first sector test is planned for B1 for the w/e of 24/25 October, from TI2 through IR2L, IR2R, arc 23 and with the beam being stopped on the momentum collimators in point 3. Possibly B2 will be used instead, depending on HWC progress.

Coordination

Safety/procedures

Documentation & resources

 

List of  LTI experts/contacts

 

 - issues

 

Logging checks

 

B1 test breakdown- overview

B1 test breakdown - details

 

** B2 Dry Run 18-19th**

** B2 preparation and checklist **

** B2 detailed programme **

 

Aperture measurements (madxPre-test preparation online)

 

Sector test coordination

SPS 2008 schedule

LHC OP wiki beam commissioning

SPS safety chains - overview

TT60/TI 2 access zones

 

SPS intensity interlock

 

 

 

 

Optics files:

LSS4/TT60 twiss file

TI 8 twiss file

LSS6/TT60 twiss file

TI 2 twiss file

SPS MAD-X files and resources

 

Aperture files:

Aperture resources

 

Measurement procedures:

Aperture measurements in injection region

 

Drawings:

LSS6 drawing SPSLNINS0086 (hpgl)

TT60 drawing SPSLTT600001 (hpgl)

TI 2 drawings

Settings/resources:

LSS6 extraction settings

LSS6 MST/E girder positions

B1 position on P2 Injection Screens

B1 MKI strength

Injecting B1 with MKI off

 

** B2 position on P8 Injection Screens **

** B2 MKI strength **

** Injecting B2 with MKI off **

 

Reference settings for injection BTV zooms

TDI positions

Blowup from Al2O3 screen

MKI kickers:

Timing distribution

Timing rack layout

Patch panel

MKI8 electrical diagram

MKI8 hydraulic

MKI8 rack layout

Slow controls IO (draft)

modifying strength - SoftStart issues